Home

Citizens' CharterProject Performance

You can help too!!!

 

Citizens' Charter -BEST Electric Supply

 
.....over-billed? …faulty meters? …new connections.

......Now is your chance to Act!

The buck stops here....

The General Manager undertakes the management of the BEST. The Deputy General Manager, Electric Supply reports to the General Manager as to the functioning of this department.

Functions....

  • New connections which also include augmentation of existing installations
  • Billing
  • Complaint redress & restoration of electric supply in cases of interruption
  • BEST undertaking supplies electricity to only those areas of the city falling within Colaba in the South upto Mahim/ Sion in the North.

    Electricity Connections

    Tatkal Scheme

    • Electricity connections are given to consumers on the same day as the application is made.
    • The scheme is only applicable for Low Voltage (L.V) Consumers.
    • The maximum limit for the sanction of such a connection is 25 Kilowatt(KW)
    • In overloaded areas the limit is 5 KW. In slum areas the limit is 2 KW
    • This connection is given subject to certain standard conditions, submission of Test Reports and the payment of a Connection Fee/ Security Deposit.
    To get an electricity connection, follow these steps..
     
    Step
    Procedure
    Address/Time
    1 Prescribed application form BEST Wards :
    South Zone - Electric House, Colaba North Zone - Transport Eng. Bldg, Tilak Marg, Dadar
    2 Submit application form and required documents Ward Officer, North / South Zone
    3 Ackowledgement of the receipt of the application Same day
    4 Scrutiny of applcation form and information about deficiencies. Same day
    5 Test Report of the licensed electrical contractor  
    6 Issue of NOC if sub-station is not required and estimate for providing service cable and meter board and its sanction. 30 days
    7 Deposits:
    Rs. 50/- per kW for *R,S, H and SN tariff
    Rs. 150/- per kW for all other tariffs
     
    8 Providing service cables in the premises of the consumer 30 days after deposit
    Except in the Monsoon
    9 Connection Fee:
    Rs 150 per kW for residential purposes
    Rs 300 per kW for other purposes
     

    *R - Private residential premises  S-Medical educational and residential premises SN-Premises used by non-profitable charitable trusts, religious institutions, residential premises let out for commercial activity H -Charitable, medical, religious institution not exempted from the levy of tax under the BMC act.

    When you require a temporary connection ......

  • Fill in the prescribed form for temporaty electric connections and pay a registration fee of Rs 4/-
  • If the connection is for religious and charitable purposes, the deposit is Rs 25 per day per kW and Rs 100 per day per kW for others.
  • Break down in the supply....

    North Zone
     
    Problem
    Area
    Centre
    Individual Problems Bombay Central, Byculla, Parel, Lower Parel, Reay Road, Sewree, Wadala, Antop Hill, Matunga East, Sion

    Sitladevi Temple, Dharavi, SVS Marg, Matunga West


    Prabhadevi, Tardeo, NM Joshi Marg

    Dadar Fust Ctr
    412 4242


    Mahim Fuse Ctr

    444 4242

    Worli Fuse Ctr
    495 4242

    Entire / Part of Building Entire North Zone Fault Control Ctr, Dadar  414 6611
    Entire Block / Whole Area Entire North Zone System Control Centre, Dadar
    414 5888

    *Assesment of billing due to defective meter will be made after watching the consumption of a replaced meter for a period of 6 months. The quantity of units so finalised will be intimated to the consumer within 30 days. Credit or debit will be reflected in the next bill.

    South Zone
     
    Problem
    Area
    Centre
    Individual Problems Girgaum, Kalbadevi, Bhedi Bazaar
     

    Peddar Road, Grant Road, JJ Hospital, Malabar Hill, Walkeshwar



    Backbay, Nariman Point, Hutatma Chowk,Fort

    Pathakwadi Fuse Centre
    208 4242

    Khetwadi Fuse Centre
    385 4242

    Colaba Fuse Centre
    218 4242

    Entire / Part of Building Entire South Zone Fault Control Ctr, Pathakwadi
    206 6611
    Entire Block / Whole Area Entire South Zone System Control Centre, Pathakwadi
    208 5888

    Billing

    The meter is read and bills are issued monthly for the HV and LV consumers and bi-monthly basis for commercial and residential consumers.

    Bills should be paid within 15 days of the issue of the Bills at any of the 48 bill collection centres or 22 banks authorised for their connection

    If the bill is paid after the due date, a Delay Payment Charge of 0.5% per week or part thereof is levied.

    To register your complaint....

    Person
    Complaint
    Time
    Superintendent
    Consumers' Department

    North / South Zone
    Excessive billing, wrong billing
    Under billing

    Written complaint with a copy of the bill
    7 days
      *Testing of defective meters
    Fee: Rs. 6/- single phase meter

    Rs. 20/- three phase meter
    Results 7 days
    Meter replaced 15 days
    Supervisor Wards Discrepancies in rate
    Discrepancies in consumption

    Delayed delivery or receipt of bills

    Refund of security deposit

    Cases relating to vacating flats
     
    Break down in the supply...
     

    If you are dissatisfied with this Municipal Service you can either:

    Find out how this department has been rated by the citizens of Mumbai, click here.

     
    | About Us | Other Projects | Related Information | Press | Forms |Contact Us | Sitemap |